Giprovostokneft is one of pioneers in designing gas processing plants, which introduction into service has provided for gas use and creation of raw material resources base for petrochemical complex of the country. Major gasoline and gas processing plants have been built and are under construction in Russia and Kazakhstan as per GIPVN projects.
Samara region
Otradny GPP, 1967
Design capacity
gas – 1.1 BSCMPA
propane-butane fraction – 15 MTPA
Samara region
Neftegorsk GPP, 1969
Design capacityWestern Siberia
Yuzhny-Balyk GPP, 1972
Design capacity
gas – 0.8 BSCMPA
Kazakhstan
Kazakhsky GPP, 1978
Design capacity
gas – 2.5 BCMPA
propane-butane fraction – 12 MTPA
sulphur – up to 1000 TPA
Kazakhstan
Zahanazol GPP, 1984
Design capacity
gas - 1 BCSMPA
elemental sulfur – 70 MTPA
Kazakhstan
Zhanazhol GPP Rehabilitation, 2000.
Design capacity
oil - 3 MMTPA
gas – 1.5 BCMPA
In 2000 GIPVN jointly with Lurgi Company (Germany) has designed second phase of Zaikinskoye GPP.
Design capacity
gas - 2 BCMPA
by oil stabilization – 3 MMTPA
by oil processing – 0.5 MMTPA
Zaikinsky gas processing plant has been elaborated in 1994/1995
Detailed design has been developed within the period 1996-2000.
Design capacity of gas processing plant:
Gas treatment quality complies with OST 51.40-83.
Oil quality – by the first group as per GOST 9965-76.
Besides, the project has provided for production of motor fuels –
500 MTPA by treated oil and production of liquefied gases: propane fraction of the “best” grade, mixtures of butanes and liquefied petroleum gases for motor transport and liquefied gases for domestic consumption.
Gas processing plant construction is taken to be carried out in 3 phase:
GPP Phase 1 has been designed and constructed with participation of “Thermo Design Engineering” Company (Canada) in the development and preparation of main process facilities. Construction of Zaikinskoye GPP phase 1 has been finished in 2001.
![]() |